Chan592 Chan592
  • 03-02-2019
  • Physics
contestada

Determine the amount of work done when a crane lifts a 100-N block form 2m above the ground to 6m above the ground

Respuesta :

hrzlatevski
hrzlatevski hrzlatevski
  • 03-02-2019

Data given:

F=100N

Δx=6m-2m=4m

A=?

Formula needed:

A=F×s

Solution:

A=100N×4m

A=400J

Answer Link

Otras preguntas

what is 89 divide into 4356
Which elements are found in high proportion in earth's crust?
Ayer nosotros____ unos anteojos de sol. A. comprasteis B. compraron C. compro D.Compramos
How would you command someone not to speak (hablar), using the tú command?
Order the numbers below from least to greatest. 310/11,79/20,3.64, and 3.906?
For a book called Maniac Magee ~ what happened that caused Maniac to "lose his power" over the McNab boys?
The statement "Love's tender arrow" is an example of a(n)
Hydrogen has three isotopes 1H, 2H, and 3H. What is the difference between these three isotopes?
• Machine s is cleaned every 12 weeks. •Machine that is cleaned every 8 weeks. What is the fewest number of weeks that will pass before both machines are cleane
A major stadium has 45,000 seats. If baseball fans have bought 5/8 of the seats for the next game, how many seats are available? 3. Draw a picture or a chart t