sum40 sum40
  • 02-04-2019
  • Mathematics
contestada

A factory worker is employed to make t-shirts. On average each t-shirt takes 3 1/2 minutes for cutting, 2 4/5 minutes for sewing and 4 1/6 minutes for finishing. What is the total time required to make one t-shirt?

Respuesta :

rueryuzakibeyond
rueryuzakibeyond rueryuzakibeyond
  • 02-04-2019

Answer:

10 14/30 or 10 7/15

Step-by-step explanation:

To find the answer, you add each of the times it takes together.

Answer Link

Otras preguntas

Why did Allies plan to land in Normandy and not somewhere else?
A hiking club has 9 members. How many ways can they choose a president, vice president, secretary, and treasurer from among the members?
what is the negative of -1/3 and why??
Who did Odysseus leave behind when he left Troy for Ithaca, and how was it destructive?
Consider the relation {(–4, 3), (–1, 0), (0, –2), (2, 1), (4, 3)}.Graph the relation.State the domain of the relation.State the range of the relation.Is
What are some 5th grade science words that start with y
Add the following fractions.3/8 + 5/12 =
how does  a star form?
three snack bars contain 1/5,0.22,and 19% of their calories from fat. which snack bar contains the least amount of calories from fat ?
Which physical feature has most limited the movement of people living in North America ?