Sadeghshakeri97 Sadeghshakeri97
  • 02-12-2019
  • Mathematics
contestada

60% of the work is done in 17 minutes, 40% of the same work, when is done (in minutes)?

Respuesta :

bridgecostello bridgecostello
  • 02-12-2019

Answer:

It would be 11.333 minutes

Step-by-step explanation:

I solved this by setting up a cross multiplication.

60%/17 so then 40/x.

Then here cross multiplying. 60x=680. divide by 60 and x would = 11.33

Answer Link

Otras preguntas

How many grams are in 0.02 moles of beryllium iodide, Bel2?
What is the difference between a physical map and a political
The rhythm of the opening statement of Beethoven's Fifth Symphony is a. s-L-s-L. b. L-s-s-s. c. s-L-s-s. d. s-s-s-L.
A line horizontally drawn from the center of the circle. a. Radius b. Axiom c. Circumference d. Vertex
1.Which one of these people is most responsible for perpetuating Bermuda Triangle myths? ◦Charles Barkley◦Charles Darwin◦Charles Berlitz◦Charlie Brown
In what year did the British raj’s rule end in India?
38 is what percent of 40
A person's master status never changes. a. true b. false
The images in The Great Figure primarily appeal to readers senses of touch and hearing. a. True b. False
IS The United States is the leading supplier of fossil fuels. a. True b. False