A critical activity is________________.a. an activity that consumes no time but shows precedence between events. b. a milestone accomplishment within the project. c. an activity with zero slack. d/ the beginning of an event.

Respuesta :

Ritmeks
Ritmeks Ritmeks
  • 09-03-2020

Answer:

C

Explanation:

Critical activity is the sequential activities from beginning to the end of a project. A lot of projects have a single critical path, although some projects may have more than one critical activity which depends on the flow logic utilized in the project.

Answer Link

Otras preguntas

Determine the percent yield for the reaction between 5.29 g of NaBr and excess chlorine gas if 3.95 g of bromine is actually formed. 2 NaBr + 1 Cl2 → 2 NaCl + 1
What has four legs, but can't run?​
Rita purchased a two pounds of oranges. Each pound of oranges was $2.47. How much money did Rita spend in all? Do not include $ in your answer.
Write and balance the following equation: Solid aluminum reacts with aqueous lead(II) nitrate to produce aluminum nitrate and solid lead.
Can I have some help?
Kann jemand helfen?Gegeben sei 3 Teilmengen A, B und C einer Grundmenge G.Vereinfachen Sie die folgenden Ausdrücke.(A geschnitten B geschnitten C) U (komplement
If f(x) = 3x – 6, create a table of values for x = –2, –1, 0, 1, 2.
A 0.0663 kg ingot of metal is heated to 241◦C and then is dropped into a beaker containing 0.395 kg of water initially at 25◦C. If the final equilibrium state o
What are the differences and similarities between Native American religion in North America and South America?
How would you give CPR to a dog?