caitlynreilly
caitlynreilly caitlynreilly
  • 02-04-2020
  • Arts
contestada

What four steps lead to successful planning of a decorating project?

Respuesta :

hhhhhhhhhhhhhhay hhhhhhhhhhhhhhay
  • 02-04-2020

Answer:

1.plan

2.buy

3.set up

4.do the project

Explanation:

Answer Link

Otras preguntas

7(y-2) 21=(2y)(3) solve the equation
Five friends split a 65.20 bill at a restaurant, they also each left 2.75 for the tip. How much money did each person pay in all?
A school coach makes a journey of 320 km. How far is this in miles if 1 km is 5/8 mile? A. 198.75 miles B. 225 miles C. 250 miles D. 275 miles
How does paragraph 6 contribute to the ideas of text in the topic of the Wild West fact or fiction
If the first term of a geometric progression is 16 and the 5th term is 9. Find the 7th term of the geometric progression
A solid rectangular block has a square base of side x cm. The height of the block is h cm and the total surface area of the block is 96 cm². Given that x can va
For a ladder to be stable the angle that is makes with the ground should be no more than 78 degree and no less then 73 degrees. What are the minimum and maximum
A solid rectangular block has a square base of side x cm. The height of the block is h cm and the total surface area of the block is 96 cm². Given that x can va
6: Which note-taking methodology employs a table or chart format to organize information? a. c) Flow Method b. a) Charting Method c. d) Mapping Method d. b) Min
What’s the next number