jeevenjoji2007
jeevenjoji2007 jeevenjoji2007
  • 01-09-2020
  • Mathematics
contestada

if 12 people can finish a job by 5 days how many days will be required finish the same job by 10 people

Respuesta :

ishashunnny
ishashunnny ishashunnny
  • 01-09-2020

Answer:

4

Step-by-step explanation:

12p=5d

1p=5/12

10p=4.1666

≈4 days

Answer Link

Otras preguntas

1+0.9+0.08+0.001 Somebody can help me please
What happened to Old Major? A. He died peacefully in his sleep. B .Mr. Jones sent him to a neighboring farm. C. Mr. Jones killed him for the meat. D. Mr. Jones
Which of the following was not a title taken by Augustus? O Pontifex maximus O Princeps O Augustus O Emperor O None of these
What is the slope of the line passing through the points (2,-5) and (4, 1)? A 5/4B 3 C 2 D -4/5​
In 1860 the small towns became a city. true or false
what is the meaning of a hybrid seed
Omar has $660 to spend at a bicycle store for some new gear and biking outfits. Assume all prices listed include tax. He buys a new bicycle for $330.64. He buys
The measure of an angle is 34.6°. What is the measure of its complementary angle?
What is the term for the type of venation seen on a ginkgo tree? Help meeeee
this is for medical detectives