how do you find the mean completion time of a PERT network diagram?​

Respuesta :

okekesarah01642112
okekesarah01642112 okekesarah01642112
  • 02-01-2021

Answer:

PERT is an estimating technique that uses a weighted average of three numbers (see below) to come up with a final estimate. The resulting PERT estimate is calculated as (O + 4M + P)/6. This is called a "weighted average" since the most likely estimate is weighted four times as much as the other two values.

Answer Link

Otras preguntas

How would you describe the Romans compared people who live in front of them? what made the Romans only? think about the many ways they were different from those
what is 65/8 as a mixed number
Can someone help me please? 1. Refer to the triangle below. If a = 3 and b = 3, A. Find the exact length of c in unsimplified radical form B. Fi
When two fractions are between 0 and half how do you know which fraction is greater explain
Montel spends $0.75 every time he plays his favorite video game. If he has $10 write and solve an inequality to find how many video games he can play
is 5000 cm bigger than 5 m
What was an important role of the Parthians in the Silk Road trade?
6 less than the quotient of h divided by 2 is 10?
What was The most important factor in the U.S. victory in the cold war ? Which president contributed the most to ending the conflict? What is the lasting effect
Yuri has a rope 12m long. he cuts it into pieces that are each 2m long. what fraction of the rope is one piece