medm0om5iebernan medm0om5iebernan
  • 01-11-2016
  • Mathematics
contestada

A construction company delivered 40 loads of concrete in 5 days.

What was their rate of work?



A.




B.




C.




D.


Respuesta :

melhunt99
melhunt99 melhunt99
  • 05-11-2016
Well 40 divided by 5 is 8 and you don't have options so I would say 8 loads a day :)
Answer Link

Otras preguntas

What are the types of flexibility?
Find the measure of A (show work please)
Which equation describes the sum of the vectors plotted below? -5
Solve the equation x^2=80
4. Which of the following abilities is not a physical property of matter? a ability to conduct heat b ability to dissolve in other substances С ability to react
Frieda’s employer offers her family health care. Frieda must contribute 21.33% of the cost, and her employer will cover the rest. Frieda gets paid on a biweekly
What is 9/10-3/4= In simplest form
If you want to be a professor, but you only have a master's degree, where can you most likely teach? a public university I a community college a college founded
Area and perimeter of 16,10,9,10, and 16
Write the equation of the line that passes through (-1, 7) and (2, 16).