Brainwash2010
Brainwash2010 Brainwash2010
  • 03-06-2021
  • Mathematics
contestada

12 men or 15 women can do a piece of work in 21 days find the number of days to complete the same work by 6 men and 10 women​

Respuesta :

LIYAH009
LIYAH009 LIYAH009
  • 03-06-2021
18 days required to complete same work by 6 men and 10 women.

Given: 12 men or 15 women can complete work in 21 days
To find: Days it takes to complete same work by 6 men and 10 women

Solution:
12 men = 15 women ⇒ 1 man
Men = women
Men =
15 women can finish the work by 21 days
6 men = women
6 men =
6 men and 10 women = =
women can finish the work= = 18 days.

Hope I helped have a good day
Answer Link

Otras preguntas

How did some southern whites deny justice to blacks during Reconstruction? Choose all correct answers. A. They passed laws restricting black voting and land own
3. A ladder is placed 5ft away from a building. The ladder comes up to 12 ft on the side of the building. How long is the ladder? 12 Equation: جا 517 Length of
What is the absolute value of -6
Please help me. The question is in the image.
What is the approximate volume of the cylinder? Use 3.14 for π.top of the cylinder is 9 bottom is 4 A. 324 cm3 B. 452.16 cm3 C. 734.76 cm3 D. 1,017.36 cm3
a circle has a circumference of 3.14 units what is the diametet
What is the product of 12 and 3?
someone please please help me with this !
Use the underlined prefixes to determine which word means “to come together.” convene advent prevent
Theresa has an umbrella stand at the beach. - All of them are blue, except for six. - All of them are yellow, except for six. - All of them are red, except for