krishnashrrstha41
krishnashrrstha41 krishnashrrstha41
  • 04-08-2021
  • Mathematics
contestada

15men can complete a piece of work in25days. how many men should be added to complete the same work in15days.​

Respuesta :

mhanifa
mhanifa mhanifa
  • 04-08-2021

Answer:

  • 10 men

Step-by-step explanation:

Amount of work done by 15 men is:

  • 15 men *25 day = 15*25 man*days

Same work can be done by 25 men, in 15 days, so 10 more men should be added.

Answer Link
abovejosh
abovejosh abovejosh
  • 04-08-2021
Answer: 10 men explanation: guy above me
Answer Link

Otras preguntas

The Spanish-american war resulted from an attempt to enforce the principles expressed by which of these?
Which river is connected to the grand canal? A Yangtze B Volga C Ganges D Indus Help plz!
How many protons are in a single nucleus of 5626fe?
What is the measure of B E​
Why did Western European economies grow faster than Eastern European economies after World War lI?
Why did Paul cry when he was changing his shirt
What hormone regulates the formation of urine
A sample of iron has a volume of 10.0 mL. The density of iron is 7.87 g/mL. Which is thecorrect expression to calculate the mass of the sample using dimensional
Finance - Sheryl and Carol work at the same company and make the same salary of $64,000 per year. Carol deposits 8% of their salary into their 401k and the comp
HALP PLEASE NEED HALP, ASAP??