alexslayer44
alexslayer44 alexslayer44
  • 01-12-2021
  • Mathematics
contestada

Jin schedules 496 hours for a project. He plans to work 8 hours each day. How many days will it take to complete the project?​

Respuesta :

penguinlife90 penguinlife90
  • 01-12-2021

Answer:

62 days

Step-by-step explanation:

496/8 = 62

Answer Link
clickykeyboardasmr
clickykeyboardasmr clickykeyboardasmr
  • 01-12-2021

496/8=62

Hope this helps!

Answer Link

Otras preguntas

What's the other word generous in overlooking insult or injury by others; rising above pettiness
If X is the set of negative numbers and Y is the set of positive numbers, then the union of X and Y and 0 is the set of (A) all real numbers (B) all integers (C
What's the other term for: one who overindulges in food and drink
what do I do to figure out this problem:3x+8=26+x
What's the word for looking down on others; proud and scornful
The diameter of a cylinder is 6 feet 6 inches. The height of a cylinder is 12 feet 3 inches. What is the surface area?    (feet squared)What is the volume?
What was the major purpose of the Truman Doctrine?
explain in steps how to graph this linear inequality 2x+3y > -2
What's the other term for: lacking respect; scornful
Which of the following steps is not critical in the creation of Bt corn?a.Cut out a piece of DNA from a DNA molecule.b.Splice a piece of DNA into DNA from anoth