In a project network, the critical path is the sequence of activities which has the:________.

Respuesta :

66hello60
66hello60 66hello60
  • 03-08-2022

Answer:

The correct answer is the longest time

Answer Link

Otras preguntas

What is the legacy of Jan, 6, 2021?
Bonjour pouvez vous m’aider… Mettez les verbes en italique au mode et au temps convenables et indiquez le nom du mode et du temps. Le livre que je _____(parcour
The water pumped out of a backyard pond. What is the domain of this graph?A.P.E.X- Algebra 1 Sem 1 Grade 9 credit
You move left 5 units. You end at (-1, 5). Where did you start?
The human body contains more than_cells •100 trillion •10 billion •100 billion
State two factors that enhanced the spread of iron working in Africa​
the spec sheet for the actual 1968 corvette shows the front frame dimension to be 32.875 inches. what would this measurement be, in both fractional and decimal
If the population is highly skewed, the sample size needed for the central limit theorem to apply usually has to be ______ that when the population is not highl
Show all work to identify the asymptotes and state the end behavior of the function f(x)=3x/x-9.
Which criteria best determines a writer's level of skill?the production of many pieces of writing in a variety of literary genresthe determination to answer eve