agyasmithmartersax agyasmithmartersax
  • 01-05-2017
  • Mathematics
contestada

An average of 2,000 charts need to be coded each month. if it takes an average of 15 minutes to code each chart— how many charts does the average coder code per 8-hour day?

Respuesta :

Bea1111 Bea1111
  • 01-05-2017
Put 8 hours into minutes which is 60•8= 480.
Then divide 480 by 15 to find how many charts are coded in 8 hours by a coder.
480/15= 32.

So the average worker codes 32 charts per 8-hour work day.
Answer Link

Otras preguntas

What is the vertex of the quadratic function f(x)=(x-6)(x+2)?
Direct Stafford Loans are funded by the
what is true of all particles of gas enclosed within a container
(04.05 MC)Which of the following is a solution to this inequality?[tex]y < \frac{2}{3} x + 2[/tex]A.(0,3)B.(-3,1)C.(3, 5)D.(1,2)​
What is the solution to this equation? X- 17 = -5
Which is the most likely cause of the observed variation?
Binding Ca2+ to the troponin complex causes ____________ to move a. troponin b. actin c. the myosin binding site d. tropomyosin
The following best describes the bourgeoisie O a wealthy social class that exploits the working classes affluent middle-class people who hire workers O a catego
A(n) _______ angle of a triangle is equal to the sum of the two remote interior angles. -Exterior -Interior -Complementary -Vertical
Hand washing is an important behavior that can help cut down your chances of becoming sick with a communicable disease.