RoboticNaruto4693 RoboticNaruto4693
  • 03-01-2018
  • Physics
contestada

How much work is done when a hoist lifts a 290-kg rock to a height of 7 m?

Respuesta :

samuraijack
samuraijack samuraijack
  • 03-01-2018
Given: Mass m = 290 Kg;  Height  h = 7 m

Required: Work = ?

Formula: Work = Force x distance  but, Force F = mg

W= fd

W = mgh

W= (290 Kg)(9.8 m/s²)(7 m)

W = 19,894 Kg.m²/s²

W = 19,894  J




  
Answer Link

Otras preguntas

Which graph does not represent a function of x?
Noah lived among godly people. True or False?(for people who read the bible)
define five ways in which technology has been used to enhance performance in sport
Where do the three rays in a ray diagram start? at a focal point on the opposite side of the lens at three different points on the object at a focal point on th
What is most important when selecting a pfd for a passenger?.
What does the pair of shoes weigh on earth
According to the law of conservation of energy, which changes would INCREASE the total energy of a system? A. An addition of 400 J of thermal energy and a loss
What is the volume of a sample of mercury, a liquid metal, if it has a density of 14 g/ml and a mass of 28 g?
-9x²(x²+2x²y - 3y²) Simplify
Write a multiplication expression to represent the number of table tennis balls in one layer of the box