tatianamcknigh tatianamcknigh
  • 02-05-2018
  • Mathematics
contestada

Joe can put up a swing set in 3 hours. Andy can put up a swing set in 5 hours. How long would it take Joe and Andy to put a swing set up if they worked together?

Respuesta :

Аноним Аноним
  • 02-05-2018
Joe = 3 hours

Andy = 5 hours

If they do it together, time needed = (3 x 5) / ( 3 + 5) = 15/8 = 1 7/8 hours.

Answer: 1 7/8 hour
Answer Link

Otras preguntas

30909990 expanded form
what role did vizier play in ancient egypt? a. commanded the army b. oversaw the government c. regulated the calendar d. supervised religious events
What was the significance of the Bronze Age?
what does my soul has grown deep like rivers mean?
when resources are used to write an essay, this needs to be place at the end in order to avoid plagiarism
How did radio shape modernism in the 1920s?
Three randomly selected households are surveyed. /The numbers of people in the households are 1, 3, and 8. Assume that samples of size n =2 are randomly selecte
the viscosity of water is a. high. b. low. c. the same as all liquids.
is 0.49 smaller than 0.72
the term angle of deviation is used in reference to a/an